The Ishikawa Diagram: Definition and Maintenance Example!
- 27/07/2026
- 15:40
reading time : 2 min
Content Marketing Manager
Table of Contents
What is the Ishikawa diagram?
Definition of the Ishikawa diagram
The principle of the Ishikawa diagram
The 5Ms of the Ishikawa diagram
- Manpower (Man): human factors, such as the skills, training, motivation, or attitude of employees.
- Materials (Material): the quality and availability of the materials used in the process.
- Methods (Method): the procedures, processes, and rules followed, as well as the way in which the work is organized.
- Machines (Machine): the equipment, tools, and technologies used in the process.
- Milieu (Environment): environmental factors, such as working conditions, temperature, humidity, or company culture.
How to create an Ishikawa diagram?
Identify the problem
Brainstorming causes
Analyze and prioritize causes
Develop and implement corrective actions
Monitoring and review
Example of an Ishikawa diagram in maintenance
- Lack of training among technicians.
- Improper handling of equipment.
- Absence of preventive maintenance procedures.
- Operator negligence.
- Wear of components.
- Manufacturing defect in the motor.
- Inadequate corrective maintenance.
- Lack of specific spare parts.
- Maintenance plan not adhered to.
- Poor organization of operations.
- Absence of up-to-date technical documentation.
- Non-standardized maintenance process.
- Poor-quality spare parts.
- Inadequate or insufficient lubricants.
- Wrong choice of components during repairs.
- Use of materials not compliant with specifications.
- High ambient temperature.
- Excessive humidity conditions.
- Accumulation of dust and debris.
- Poor ventilation around the motor.
How to combine it with project management?
-
Combining the Ishikawa diagram with project management makes it possible to identify and analyze the potential causes of problems at every stage of the project. Here is how to integrate it effectively:
- Risk identification: use the diagram to explore the causes of risks in each phase of the project.
- Cause analysis: classify causes using the 5Ms to understand the influencing factors.
- Planning corrective actions: prioritize and develop solutions for critical causes.
- Project monitoring: monitor the effectiveness of corrective actions.
- Using an appropriate tool: adopt project management software capable of creating and managing Ishikawa diagrams, thereby facilitating collaboration and real-time updating of analyses. This ensures greater traceability and efficiency in project risk management.
Integrating the Ishikawa diagram into project management and maintenance processes is a proactive approach that makes it possible to anticipate problems and improve overall performance. By combining this tool with project management software, it is possible to maximize the efficiency of analyses and ensure more rigorous and transparent risk management. Adopting this approach contributes to better decision-making and to the success of projects.
Projet, demande de démonstration ou d’essai gratuit ?
Frequently Asked Questions
FAQ – The Most Frequently Asked Questions About Nomadia
Why Choose Nomadia?
As France’s leading publisher of Smart Mobility SaaS solutions, Nomadia supports more than 175,000 field professionals every day. Our solutions are easy to use, quick to deploy, and deliver significant and immediate return on investment.
Drawing on the expertise of both a software publisher-integrator and a consulting firm, Nomadia’s teams provide tailored support, from data consulting to the deployment of mobile devices. Finally, our technical support team is available 24/7 to assist you.
Who Are Nomadia Solutions Designed For?
Nomadia solutions support the digital transformation of all mobile professionals: field sales representatives, delivery drivers, technicians, auditors, healthcare workers, inspectors, service providers, security patrol officers, experts, and more.
Whether for SMEs or large enterprises, our solutions adapt to businesses of all sizes and across all industries.
How Much Does It Cost?
Nomadia Delivery offers transparent and flexible pricing, which primarily depends on the number of users (for example, planners and dispatchers) rather than a fixed cost per parcel.
Thanks to this model, you can control your delivery costs based on the number of resources (users) involved in route management, providing great flexibility to adjust your subscription according to the size of your fleet and your operational needs.
Is It Compatible with My Current ERP System?
Yes! Nomadia Delivery has been designed to integrate quickly and easily into your existing environment thanks to our powerful and secure APIs. Our solution is compatible with most ERP systems on the market. API integration enables the automatic synchronization of your transport orders, customer orders, and customer information, ensuring smooth and error-free delivery tracking. The solution also offers user-friendly import capabilities with data validation controls, as well as export options in multiple customizable formats.
Is It Suitable for Our Delivery Volume?
Yes, Nomadia Delivery is ideal for companies that manage a high volume of deliveries and want to optimize their routes, create balanced territories for their drivers, and ensure precise tracking of every parcel. Nomadia Delivery adapts to fleets of all sizes!
Can Multiple Warehouses or Depots Be Managed?
Yes, our solution allows you to manage multiple warehouses or depots. It centralizes data and optimizes routes or service operations for each of them.
Is There a Limit to the Number of Stops in Route Optimizations?
No, there is no strict limit to the number of stops in route optimizations. Our solution can handle large volumes of stops and quickly calculate optimized routes.
Project, request for a demonstration or a free trial?


